205-EVAReport
Eva Report
02/05/2014
Lucie Ploulet
Eva Number:
3
Eva Date:
02/05/2014
Time Slot:
laterPM
Purpose:
Habitat documentation/dimensions
Narrative:
Research hardware assembly took longer than expected and the EVA members exited the airlock at 16:00 instead of 14:00.
Due to the scratched helmets, difficulties were experienced in reading measurements. And extreme dexterity issues were experienced in handling the measurement tools.
Head mounted display ergonomics experiment was performed well and most of the desired measurements were acquired.
Eva Depart Time:
16:00
Check In Time One:
16:15
Check In One E:
Check In One N:
Check In Note One:
around the hab
Check In Time Two:
16:30
Check In East Two:
Check In Note Two:
around the hab
Check In Time Three:
16:45
Check In East Three:
Check In North Three:
Check In Note Three:
around the hab
Check In Time Four:
17:00
Check In East Four:
Check In North Four:
Check In Note Four:
around the hab
Eva Return Time:
17:30
Wp1 E:
Wp1 N:
Waypoint1arrive Time:
16:00
Eva W P1depart Time:
16:30
Wp1 Find:
Measurement of the clearance distance between the hab and the terrain
Wp2 E:
Wp2 N:
Eva W P2arrive Time:
16:30
Eva W P2depart Time:
16:45
Wp2 Find:
Measurement of the external structures of the hab on the side of the airlock
Wp3 E:
Wp3 N:
Eva W P3arrive Time:
16:45
Eva W P3depart Time:
17:00
Wp3 Find:
Measurement of the external structures of the greenhab
Wp4 E:
Wp4 N:
Eva W P4arrive Time:
17:00
Eva W P4depart Time:
17:15
Waypoint Four Finding:
Measurements of the distance from the greenhab to the observatory
Waypoint Five Easting:
Waypoint Five Northing:
Waypoint Five Arrive Time:
17:15
Waypoint Five Depart Time:
17:30
Waypoint Five Findings:
Measurement of the external structures of the hab on the side of the engineering airlock and external water tank