207-EngineeringReport
Engineering Report
02/07/2015
Duarte Sousa
Diesel – 48%
Propane – 16%
Gasoline (2x 5 Gal for ATV) – 10%
Water (trailer) – empty
Water (static) – 15 cm from top
Trailer to Static Pump used - yes
Water (loft) – gallons 30
Static to Loft Pump used - yes
Water Meter (Gallons:xxxxx.xy) - 916400 x0.1
Atv #1 Oil Checked: OK
Atv #2 Oil Checked: OK
Atv #3 Oil Checked: OK
Atv #4 Oil Checked: couldn't find oil probe
Atv #5 Oil Checked: OK
ATV #1 Fuel Used Gals: 0.5
ATV #2 Fuel Used Gals: 0.5
ATV #3 Fuel Used Gals: 0.5
ATV #4 Fuel Used Gals: 0.5
ATV #5 Fuel Used Gals: 0.5
ATVs fuel topped off
ATV #1 Tires Status: OK
ATV #2 Tires Status: OK
ATV #3 Tires Status: OK
ATV #4 Tires Status: OK
ATV #5 Tires Status: OK
ATV #1 Hours Used Day: 0.8
ATV #2 Hours Used Day: 0.8
ATV #3 Hours Used Day: 0.8
ATV #4 Hours Used Day: 0.8
ATV #5 Hours Used Day: 0.8
ATV Notes And Comments: All ATV's are working nominal
Summary of Engineering activities: Engineering check, change of furnace filter, application of plastic bags on static tank pump extension cable (check attached picture). ATV's and car cleaned for next crew. Engineering handover for the next crew engineer.
Questions and Concerns to Mission Support: None.
Thank you so much for the support during these two weeks, it was a good collaboration!!!
Best regards,
Duarte Sousa