0104-EngineeringReport
ENGINEERING REPORT SOL 09
Date: 04 January 2016
Crew Engineer Name: MARC CAROFANO III
Diesel – 20 %
Propane –35 psi
Gasoline (5 Gallon containers for ATV) – 2 FULL 5 GALLON JUGS
Water (trailer) measured in inches from the top– 30 IN
Water (static) measured in inches from the bottom – 33.0 IN
Trailer to Static Pump used – NO
Water (loft) – 6
Static to Loft Pump used – YES
Water Meter: 01029995.0
Atv # Oil Checked: NO
Atv # Fuel Used Gals: 0
Atv # Tires Status: GOOD
Atv # Hours Used Day: N/A
Atv # Notes And Comments:
Summary of Engineering activities:
ATEMPTED TO STITCH TOGETHER A 360 PHOTO OF THE HAB VERY HARD WITHOUT KNOWING OR HAVING EXPERIENCE DOING THIS.
Notes:
Everything looks fine from the Engineering Checks
Questions and Concerns to Mission Support
REQUESTS