0120-EngineeringReport

SOL 11

ENGINEERING REPORT

Crew Engineer Name: MIKHAIL KHMELIK

Date: 20 January 2016

Diesel – 69%

Propane – 19%

Gasoline (5 Gallon containers for ATV) – 1-1/4 FULL

Water (trailer) measured in inches from the top – 30

Water (trailer) measured in inches from the bottom – 12 IN

Water (static) measured in inches from the bottom – 40 IN

Trailer to Static Pump used – YES

Water (loft) – 9

Static to Loft Pump used – YES

Water Meter: 0103641.1

Atv # Oil Checked: NO

Atv # Fuel Used Gals: 0.5 GALLON

Atv # Tires Status: GOOD

Atv # Hours Used Day: 1 HOUR

Atv # Notes And Comments: ALL GOOD

Summary of Engineering activities:

EVA, ENGINEERING CHECKS

Notes:

EVERYTHING LOOKS FINE FROM THE ENGINEERING CHECKS.

Questions and Concerns to Mission Support:

ATV#4 DIED DURING EVA. LOOKS LIKE THE BATTERY GOT DISCHARGED BECAUSE HEAD LIGHTS WERE ON FOR TOO LONG. TOMORROW DURING THE ENGINEERING CHECKS I WILL CHARGE IT AND TRY TO RESTART THE ATV.

THE WATER LEVEL IN TRAILER IS GETTING LOW. WE WILL BE FINE UNTIL THE END OF OUR MISSION, BUT NEXT CREW WILL NEED IT VERY SOON.

Requests:

NONE