0103-EVAReport
EVA Number: Crew 160
EVA #07 Summary Report
EVA Date: 3rd Jan 2016
Crew Commander Reporting
Purpose of EVA: Monitor and retrieve the Sandstorm Rover while engineer tests form engineering deck. Conducted engineering check list.
Location of EVA: 12S-518655E-4250895N
Number of EVA Crew: 2
Crew Members going on EVA: Ashley, Lycourgos
ATVs:
- ATV 1 Used: no
- ATV 2 Used: no
- ATV 3 Used: no
- ATV 4 Used: no
ATV time usage: N/A
Duration of EVA: ~1 Hour
EVA departure time: 1054
EVA return time: 1216
Time Checks:
- 1st:1630
Summary: The EVA was successful. We safely tested the rover with Ashley and I monitoring its movement. We retrieved the rover and transported to engineer through 3 minute recompression once finished. We dropped the meter stick inside the static tank – it is sitting at a slant near the bottom and we are currently looking into how to reach it. From the looks of it, it is not causing any damage whatsoever.