316-EngineeringReport

Hello Mission Support,

Engineering Report

Date: March 16, 2015

Crew Engineer Name: Mehdi Scoubeau

Diesel – 78%

Propane – 58%

Gasoline – 2 gallons in tank

Water (trailer) – distance from top: 90 cm

Water (static) – distance from top: 45 cm

Trailer to Static Pump used - no

Water (loft) – 25 gallons

Static to Loft Pump used – yes

Summary of Engineering activities:

- I prepared the EVA of tomorrow by cleaning all the helmets and checking the ventilation backpacks as well as headsets/micros. Only 3 out of 7 micros work. Ventilation backpack 1 does not seem to be working either.

- On main generator

- Internet connection via WiFi

- HALpr on

Questions and Concerns to Mission Support:

- Some pages (“record eva plan” and “explore possible eva routes”, for example) on HALpr do not seem to be available because of a “internal server error”, is it normal ?

- We are currently very low on water (in the trailer tank) and on ATV gasoline.

- DG came to pick up the truck keys

Thank you,

Mehdi Scoubeau