506-EngineeringReport
Engineering Report
05/06/2015
Crew 154 Engineer - Petr Prokop
(report daily) Diesel fuel 25 %
(report daily) Propane 49 %
(report daily) Gasoline 17 gallons
(report daily) Water (trailer) full - 550 gallons
(report daily) Water (static) 22.8 cm
(report daily) Trailer to Static Pump used no
(report daily) Water (loft) 51 gallons
(report daily) Static to Loft Pump used yes
No Atv used
(report daily) Summary of Engineering activities: Power generator broke down during the day -
we contacted DG who came to Hab, turned the backup generator (CAT) on and start fixing the
primary one. At this moment we're running on the CAT generator.
(report daily) Questions and Concerns to Mission Support: --