0303-EVAReport

> EVA Report:

>

>

>

> EVA #11A

>

>

>

> Crew members: Arthur LILLO (EVA leader), Mehdi SCOUBEAU and

> Mohammad IRANMANESH

>

>

>

> Location: 12S-520235E-4250690N (returning to the canyon with

> the ATVs)

>

>

>

> Time: departure at 9:30 a.m.

>

> Duration: 3h

>

>

>

> Purposes:

>

> - Evaluate our ability to securely transport the CRV on an

> ATV

>

> - Exploration of the canyon

>

> - Project CRV:

>

> Exploration of a cliff in the canyon

>

> Test of the remote control of the camera

>

> - Project MOMA

>

>

>

>

>

> HabCom: Louis Maller

>

>

>

> 9:30 a.m.: EVA#11A left Main Airlock

>

> 9:35 a.m.: Engineer checks complete

>

> 9:40 a.m.: MOMA, the NorCal Rover and the CRV taken outside

> of the

>

> Engineering Airlock

>

> 9:45 a.m.: CRV installed on the red ATV

>

> 9:55 a.m.: EVA#11A departed

>

> 10:15 a.m.: EVA#11A reached the canyon

>

> 10:50 a.m.: Test of the CRV on a cliff in the canyon

>

> 11:05 a.m.: Exploration of the canyon

>

> 11:45 a.m.: ATVs taken to go back to the Hab

>

> 12:15 a.m.: EVA#11A is back to the Hab

>

> 12:20 a.m.: MOMA, Norcal Rover and CRV inside Engineering

> Airlock

>

> 12:30 a.m.: EVA#11A entered Main Airlock

>

>

>

> Summary:

>

> We installed the MOMA experiment and the NorCal Rover near

> the Hab. It

>

> took us around ten minutes to install the CRV securely on

> the red

>

> Honda. We took this one and the ATVs #2 and #3 on the Main

> Road to the

>

> North, then turned East and reached the canyon. There, we

> found an

>

> interesting cliff on which we tested the CRV. The remote

> control of

>

> the camera worked well. After that we went walking further

> in the

>

> canyon and took lots of pictures. We went back to the Hab

> closing the

>

> loop by the South. We were surprised to find the NorCal

> Rover quite

>

> far from the Hab, it must have stopped because it was out of

> the range

>

> of the wifi.