0303-EVAReport
> EVA Report:
>
>
>
> EVA #11A
>
>
>
> Crew members: Arthur LILLO (EVA leader), Mehdi SCOUBEAU and
> Mohammad IRANMANESH
>
>
>
> Location: 12S-520235E-4250690N (returning to the canyon with
> the ATVs)
>
>
>
> Time: departure at 9:30 a.m.
>
> Duration: 3h
>
>
>
> Purposes:
>
> - Evaluate our ability to securely transport the CRV on an
> ATV
>
> - Exploration of the canyon
>
> - Project CRV:
>
> Exploration of a cliff in the canyon
>
> Test of the remote control of the camera
>
> - Project MOMA
>
>
>
>
>
> HabCom: Louis Maller
>
>
>
> 9:30 a.m.: EVA#11A left Main Airlock
>
> 9:35 a.m.: Engineer checks complete
>
> 9:40 a.m.: MOMA, the NorCal Rover and the CRV taken outside
> of the
>
> Engineering Airlock
>
> 9:45 a.m.: CRV installed on the red ATV
>
> 9:55 a.m.: EVA#11A departed
>
> 10:15 a.m.: EVA#11A reached the canyon
>
> 10:50 a.m.: Test of the CRV on a cliff in the canyon
>
> 11:05 a.m.: Exploration of the canyon
>
> 11:45 a.m.: ATVs taken to go back to the Hab
>
> 12:15 a.m.: EVA#11A is back to the Hab
>
> 12:20 a.m.: MOMA, Norcal Rover and CRV inside Engineering
> Airlock
>
> 12:30 a.m.: EVA#11A entered Main Airlock
>
>
>
> Summary:
>
> We installed the MOMA experiment and the NorCal Rover near
> the Hab. It
>
> took us around ten minutes to install the CRV securely on
> the red
>
> Honda. We took this one and the ATVs #2 and #3 on the Main
> Road to the
>
> North, then turned East and reached the canyon. There, we
> found an
>
> interesting cliff on which we tested the CRV. The remote
> control of
>
> the camera worked well. After that we went walking further
> in the
>
> canyon and took lots of pictures. We went back to the Hab
> closing the
>
> loop by the South. We were surprised to find the NorCal
> Rover quite
>
> far from the Hab, it must have stopped because it was out of
> the range
>
> of the wifi.