123-EngineeringReport
Engineering Report
01/23/2015
Rebeca Rodriguez
Resources:
Diesel: 50%
Propane: 30%
Static tank: 38 cm from the top
Water:
This morning, we attempted to fill the loft tank before the EVA, but water did not flow from the static tank. We were able to fill the
loft tank without any issues at noon.
ATV:
We are awaiting fuel for the ATV’s.
The training for Crew 148 begins tomorrow. We are prepared to show them the systems and reports. Thanks for the support and
guidance while working with the water tanks and ATV’s.