0123-EngineeringReport

SOL 14

ENGINEERING REPORT

Crew Engineer Name: MIKHAIL KHMELIK

Date: 23 January 2016

Diesel – 69%

Propane – 15%

Gasoline (5 Gallon containers for ATV) – 2 FULL

Water (trailer) measured in inches from the top – 30

Water (trailer) measured in inches from the bottom – 12 IN

Water (static) measured in inches from the bottom – 29 IN

Trailer to Static Pump used – N)

Water (loft) – 9

Static to Loft Pump used – YES

Water Meter: 0103837.2

Atv # Oil Checked: NO

Atv # Fuel Used Gals: NONE

Atv # Tires Status: GOOD

Atv # Hours Used Day: NONE

Atv # Notes And Comments: ALL GOOD

Summary of Engineering activities:

ENGINEERING CHECKS, TRAINING.

Notes:

EVERYTHING LOOKS FINE FROM THE ENGINEERING CHECKS.

NOTE PROPANE LEVEL!

THERE ARE 5 WORKING AND CHARGEABLE SUITS IN THE HAB.

Questions and Concerns to Mission Support:

LOOKS LIKE THERE IS A LEAK OF WASTE WATER FROM THE SHOWER. THE RESTROOM LOOK FINE. I WILL SEND PHOTOS TOMORROW.

Requests:

NONE