Engineering report

Date: Dec 22nd 2015

Crew Engineer Name: Chiara Cocchiara

Diesel – 38 %

Propane –55 psi

Gasoline (5 Gallon containers for ATV) – 5

Water (trailer) measured in cm from the bottom– 15.5 cm

Water (static) measured in cm from the top – 28.5 cm

Trailer to Static Pump used – no

Water (loft) – 9

Static to Loft Pump used - yes

Water Meter:

Atv # Oil Checked: 0

Atv # Fuel Used Gals: 1/3

Atv # Tires Status: 0

Atv # Hours Used Day: 1 Hour

Atv # Notes And Comments: 0

Summary of Engineering activities:

Everything looks fine from the Engineering Checks

Questions and Concerns to Mission Support:

Walkie Talkie number 4 seems to have some issues during communications. We hear a constant static noise.