1104-EngineeringReport
--------------------------------------------------------------------------------
Engineering Report
--------------------------------------------------------------------------------
Date: 04 November 2015
Crew Engineer Name: Stergios Palpanis
Diesel – 30%
Propane – 40% (gauge at the top of the tank)
Gasoline (5 Gal for ATV) – 50%
Water (trailer) – 65cm from the bottom
Water (static) – 57cm from the top
Trailer to Static Pump used - No
Water (loft) – 50 gallons
Static to Loft Pump used - Yes
Water Meter 100.300,70 Gallons on arrival (28/10/2015)
Atv # Oil Checked: Oil indicators are checked
Atv # Fuel Used Gals: 2.5 gallons
Atv # Tires Status: Good condition (arrival)
Atv # Hours Used Day: 3 Atv for half hour (familiarize using them EVA suits)
Atv # Notes And Comments: No Comments
Summary of Engineering activities:
Last night the water pump filter, at the loft, was cleaned because it was clogged. Since we
cleaned it the sound of pump, when is working, is much less.
Work was continued the at the deck outside the engineering airlock
Plastic wall at the engineering lab was replaced from dry wall.
Questions and Concerns to Mission Support: