0110-EngineeringReport
ENGINEERING REPORT SOL 1
Date: 10 January 2016
Crew Engineer Name: MIKHAIL KHMELIK
Diesel – 4/5
Propane –30%
Gasoline (3 Gallon containers for ATV) – 1 FULL, 1 HALF FULL
Water (trailer) measured in inches from the top– FULL
Water (static) measured in inches from the bottom – 30.0 IN
Trailer to Static Pump used – NO
Water (loft) – 7
Static to Loft Pump used – YES
Water Meter: 0103217.8
Atv # Oil Checked: NO
Atv # Fuel Used Gals: NONE
Atv # Tires Status: GOOD
Atv # Hours Used Day: NONE
Summary of Engineering activities:
HUB CLEANING, ENGINEERING CHECKS
Notes:Everything looks fine from the Engineering Checks