219-EVAReport
02/19/2014
Olivier Gobert
Eva Number:
4
Eva Date:
02/19/2014
Time Slot:
earlyPM
Purpose:
The aim of the EVA was to collect data in the river of the streambed project and to collect mineral samples at the dry lake for the UV-mineral project.
Narrative:
The EVA started at 14:30. After 500 meter road, the leader and the Nav decided to abort the EVA due to bad weather. Indeed, the wind was too strong to communicate with each other and to stand steady. The sky also was cloudy and dark so we were afraid of strong raining. The EVA ended at 15:15.
Eva Depart Time:
14:30
Check In Time One:
Check In One E:
Check In One N:
Check In Note One:
Check In Time Two:
Check In East Two:
Check In Note Two:
Check In Time Three:
Check In East Three:
Check In North Three:
Check In Note Three:
Check In Time Four:
Check In East Four:
Check In North Four:
Check In Note Four:
Eva Return Time:
15:15
Wp1 E:
Wp1 N:
Waypoint1arrive Time:
Eva W P1depart Time:
Wp1 Find:
Wp2 E:
Wp2 N:
Eva W P2arrive Time:
Eva W P2depart Time:
Wp2 Find:
Wp3 E:
Wp3 N:
Eva W P3arrive Time:
Eva W P3depart Time:
Wp3 Find:
Wp4 E:
Wp4 N:
Eva W P4arrive Time:
Eva W P4depart Time:
Waypoint Four Finding:
Waypoint Five Easting:
Waypoint Five Northing:
Waypoint Five Arrive Time:
Waypoint Five Depart Time:
Waypoint Five Findings: