414-CommanderCheckInReport
CommanderCheckIn Report
04/14/2014
Jorge Mírez
Crew Physical Health:
All are well.
Eva Depart Time:
1000 h
Eva Return Time:
1200 h
Narrative Of Field Mission Results:
Luciana, Adolfo Adolfo EVA to test and assemble the cover greenhab,
found it difficult, therefore, it was tested in Hab put it together,
and then the cover was tested out on the land cover
Eva Depart Time:
1700 h
Eva Return Time:
1900 h
Narrative Of Field Mission Results:
George and Ruth EVA performed to study the terrain and the trajectory
( path ) of the Martian cycle was determined. The Martian bike is an
accessory ergonomic backpack ( jorge 's Project ). With Ruth a
possible path is evaluated. In this moment, Diego is in Hab, I ask to
join me in evaluating ground, path and bike tests. Then Ruth joined
Hab, leaves Diego, following the procedure of input and output to Hab.
With Diego make a second run for the likely trajectory determined with
Ruth, make corrections and the path is defined. The coordinates of the
trajectory send in other email. Jorge enters Hab to take bike complete
procedure more than 6 minutes of entry and exit, Jorge goes with bike
and motorcycle helmet, backpack and other obligatory dress . Jorge and
Diego, walking the path with bike without riding it. There are hard
areas and sandy areas where wheel can lock up. Then he proceeds to try
bicycle with anti -UV lenses without a clear protective visor helmet .
The first tour on bike is complete without news (duration 2 minutes) ,
get used to balance and coordinate movement of feet in the pedal.
Second route is anti -UV glass lenses and protective motorcycle helmet
(duration 2 minutes 36 seconds ). Then Diego bicycle test in short
sections . Finally we proceed to enter Bike Room has good benefits,
some things to improve upon assessment bolts and axle adjustments will
be made.
Eva Depart Time:
Eva Return Time:
Narrative Of Field Mission Results:
Eva Depart Time:
Eva Return Time:
Narrative Of Field Mission Results:
Eva Depart Time:
Eva Return Time:
Narrative Of Field Mission Results:
Hab Maint:
Heating control cover (located on the first floor lavatory) fell.
This scared a little crew. In another email sent photos and consult
about whether we can secure the cover with tape, which is the material
that has been fixed.
Rep Sched:
Tomorrow Plan:
Diego, in its draft traking , EVA make two scans : one foot (radius of
500 feet around Hab) and the other ATV (possibly o.3 miles to the
North, which coincides with the road you enter with MDRS mobility ) .
Will write detail proposal Diego EVA morning and a request for
consultations .
Luciana evaluate your computer cover design , in order to make known
in detail to the group and discuss possible strategies together or
procedures to place cover on GreenHouse .
Adolfo will continue its procedures in its draft quinoa .
Luiggi continue his work as engineer MDRS and also continue making
WaterFlow project details . This project is working with Diego. Asked
permission to use akin van to make a recognition of the way forward
from the MDRS to the paved road, this to be prepared for any emergency
situation. Accompany Diego and Luciana . PS: So far Diego led the van
so far.
Jorge project in its ergonomic backpack, first assess the condition of
the bike then held today (settings, tolerances). It shall assess the
assembly / disassembly of the bike in the stretcher mode(strecher is
second mode of bike). If everything goes well, ask permission to EVA
spacesuits bicycle stretcher to assess how new path to be determined.
Inventory:
Support Req:
Miscelleneous:
When George and Ruth were in EVA, a plane flew over the MDRS twice.
The first of about 200 meters. The second time in counterions sense
about 100 meters high. Gray. Could not determine any logo.