220-EVAReport

02/20/2014

Olivier Gobert

Eva Number:

5

Eva Date:

02/20/2014

Time Slot:

earlyPM

Purpose:

Data collecting on the river of the streambed project. Sample collecting of minerals for the UV project.

Narrative:

The EVA started at 14:30. The way to the first spot was a new road straight north. This road goes to the west of the hill at the north of the MDRS. The first spot was reached at 15:00. The data collecting went well and quickly. The second spot was reached at 15:45. The mineral collecting went well but was too short in time. However, the spot looks really promising and we expect a lot of the next EVA. The weather conditions were excellent for the work and the team was really satisfied of this EVA. The EVA ended at 16:45

Eva Depart Time:

14:30

Check In Time One:

Check In One E:

Check In One N:

Check In Note One:

Check In Time Two:

Check In East Two:

Check In Note Two:

Check In Time Three:

Check In East Three:

Check In North Three:

Check In Note Three:

Check In Time Four:

Check In East Four:

Check In North Four:

Check In Note Four:

Eva Return Time:

16:45

Wp1 E:

518745

Wp1 N:

4251741

Waypoint1arrive Time:

15:00

Eva W P1depart Time:

15:30

Wp1 Find:

data for the streambed project

Wp2 E:

518598

Wp2 N:

4252685

Eva W P2arrive Time:

15:45

Eva W P2depart Time:

16:15

Wp2 Find:

samples of minerals

Wp3 E:

Wp3 N:

Eva W P3arrive Time:

Eva W P3depart Time:

Wp3 Find:

Wp4 E:

Wp4 N:

Eva W P4arrive Time:

Eva W P4depart Time:

Waypoint Four Finding:

Waypoint Five Easting:

Waypoint Five Northing:

Waypoint Five Arrive Time:

Waypoint Five Depart Time:

Waypoint Five Findings: