1210-EVAReport
Eva Report
12/10/2014
Juho Vehvilainen
Eva Number:
8
Eva Date:
12/10/2014
Time Slot:
laterAM
Purpose:
Soil moisture project: increase the spatial coverage
Narrative:
Today Crew Engineer Victor Luo and Crew Scientist Juho Vehviläinen did a two-hour long EVA. The purpose of this EVA was to get more data for the soil moisture project. See more in science report from the same day.
In the beginning of the EVA Crew Engineer Victor Luo did the engineering checks. Also, we filled the outer water tank.
We left the Hab with a visiting reporter from KSL-TV at 1001. Using two ATVs we propagated to our first field site (WP1) about 2 kilometers away from the Hab. We had the pleasure of being filmed while doing soil moisture measurements near WP1. In the beginning of the transect comms to the Hab were not too good, however, when we continued the transect to Easterly direction we had direct line of sight to the Hab and consequently clear communications.
The second field (WP2) site was 0.5 kilometers away towards North from the first site (WP1). When arriving to the second site we did not have comms with the Hab. Victor drove back to the last known location of good comms and notified the Hab about the situation. After the comms check, the ATVs were parked next to the road and our second transect of soil moisture measurements commenced, this time to Westerly direction. We acquired comms with the Hab shortly (100 meters to West) after starting the transect and the were able to keep the good comms for the most part of the time.
At 12001 we departed from the WP2 back to the Hab and arrived at 1209 just to see the reporter leave the premises.
Overall the EVA went well and the scientific objectives were fulfilled. The comms were mostly working fine. The only issue was with fogging of the helmet visor. Approximately 50% of the field of view was blocked while walking.
Eva Depart Time:
1001
Check In Time One:
1045
Check In One E:
519171
Check In One N:
4251932
Check In Note One:
Radio check at WP1
Check In Time Two:
1102
Check In East Two:
519171
Check In Note Two:
Radio check at WP1
Check In Time Three:
1135
Check In East Three:
518768
Check In North Three:
4252765
Check In Note Three:
Radio check at WP2
Check In Time Four:
1209
Check In East Four:
518230
Check In North Four:
4250720
Check In Note Four:
Arrive at HAB
Eva Return Time:
1213
Wp1 E:
519171
Wp1 N:
4251932
Waypoint1arrive Time:
1025
Eva W P1depart Time:
1115
Wp1 Find:
Soil moisture transect, WP1
Wp2 E:
518768
Wp2 N:
4252765
Eva W P2arrive Time:
1124
Eva W P2depart Time:
1201
Wp2 Find:
Soil moisture transect, WP2
Wp3 E:
Wp3 N:
Eva W P3arrive Time:
Eva W P3depart Time:
Wp3 Find:
Wp4 E:
Wp4 N:
Eva W P4arrive Time:
Eva W P4depart Time:
Waypoint Four Finding:
Waypoint Five Easting:
Waypoint Five Northing:
Waypoint Five Arrive Time:
Waypoint Five Depart Time:
Waypoint Five Findings:
-----------------------------
EvaPlan Report
12/10/2014
Yusuke Murakami
Point0 Away:
0
Point0 East:
518230
Point0 North:
4250725
Purpose0:
home
Point1 Away:
1032
Point1 East:
518600
Point1 North:
4251689
Purpose1:
Meteorological and Topographical Astrobiology Exploration
Point2 Away:
612
Point2 East:
518322
Point2 North:
4251331
Purpose2:
Meteorological and Topographical Astrobiology Exploration
Point3 Away:
1193
Point3 East:
519003
Point3 North:
4251634
Purpose3:
Meteorological and Topographical Astrobiology Exploration Eva Number:
9
Go Rogue:
yes
Route Change:
RS007, then RS001, then RS002 via ATV.
Lead Name:
Yusuke Murakami
Suit Num One:
1
Atv Num One:
1
Navi Name:
Victor Luo
Suit Num Two:
2
Atv Num Two:
3
Three Name:
Heidi Beemer
Suit Num Three:
3
Atv Num Three:
4
Four Name:
Suit Num Four:
Atv Num Four:
Five Name:
Suit Num Five:
Atv Num Five:
Depart Time:
10:00