0406-EngineeringReport

Good day, Mission Support,

Date: 06APR2016 at 7:53 PM

Crew Engineer Name: Jonathan Beechner

Diesel – 50%

Propane – 35%

Gasoline (5 Gallon containers for ATV) – 1 full container, 1 half full container

Water (trailer) measured in cm from the bottom – NA

Water (static) measured in cm from the bottom – 24.5in / 42in

Trailer to Static Pump used – Yes

Water (loft) – 47 gallons

Static to Loft Pump used – 64 gallons

Water Meter: 107263,1 gallons

Summary of Engineering activities: Routine check, filled ATV’s 1, 2, and 3 with gas. D. G. came and took the trailer. I emptied the tank before he left. He also took the diesel container and left another container of gas.

Questions and Concerns to Mission Support: No

Power: No word from Shannon today. Presumably still on cat.

Jonathan Beechner

Crew Engineer