MISSION SUPPORT
SOL 7
ENGINEERING REPORT
Crew Engineer Name: MIKHAIL KHMELIK
Date: 17 January 2016
Diesel – 70%
Propane – 20%
Gasoline (5 Gallon containers for ATV) – 1-1/4 FULL
Water (trailer) measured in inches from the top – 15
Water (trailer) measured in inches from the bottom – 27 IN
Water (static) measured in inches from the bottom – 29 IN
Trailer to Static Pump used – NO
Water (loft) – 9
Static to Loft Pump used – YES
Water Meter: 0103499.2
Atv # Oil Checked: NO
Atv # Fuel Used Gals: 0.5 GALLON
Atv # Tires Status: GOOD
Atv # Hours Used Day: 1 HOUR
Atv # Notes And Comments: ALL GOOD
Summary of Engineering activities:
EVA, ENGINEERING CHECKS, ATVs REFILLED
Notes:
EVERYTHING LOOKS FINE FROM THE ENGINEERING CHECKS.
Questions and Concerns to Mission Support:
NONE
Requests:
NONE