0112-EngineeringReport

SOL 3

ENGINEERING REPORT

Crew Engineer Name: MIKHAIL KHMELIK

Date: 12 January 2016

Diesel – 75%

Propane – 27%

Gasoline (3 Gallon containers for ATV) – 1 FULL, 1 HALF FULL

Water (trailer) measured in inches from the top – 0Water (trailer) measured in inches from the bottom – 42 IN

Water (static) measured in inches from the bottom – 26 IN

Trailer to Static Pump used – NO

Water (loft) – 12

Static to Loft Pump used – YES

Water Meter: 0103304.7

Atv # Oil Checked: NO

Atv # Fuel Used Gals: NONE

Atv # Tires Status: NO

Atv # Hours Used Day: NONE

Atv # Notes And Comments: ALL GOOD

Summary of Engineering activities:

EVA, ENGINEERING CHECKS

Notes:

EVERYTHING LOOKS FINE FROM THE ENGINEERING CHECKS

Questions and Concerns to Mission Support:

NONE

Requests:

NONE