0116-EngineeringReport
SOL 7
ENGINEERING REPORT
Crew Engineer Name: MIKHAIL KHMELIK
Date: 16 January 2016
Diesel – 70%
Propane – 21%
Gasoline (5 Gallon containers for ATV) – 1 FULL
Water (trailer) measured in inches from the top – 15
Water (trailer) measured in inches from the bottom – 27 IN
Water (static) measured in inches from the bottom – 30IN
Trailer to Static Pump used – NO
Water (loft) – 9
Static to Loft Pump used – YES
Water Meter: 0103468.8
Atv # Oil Checked: YES
Atv # Fuel Used Gals: NO
Atv # Tires Status: GOOD
Atv # Hours Used Day: NONE
Atv # Notes And Comments: ATV#2 BATTERY IS DEAD
Summary of Engineering activities:
EVA, ENGINEERING CHECKS, PICKED UP MISSING CREW MEMBER
Notes:
EVERYTHING LOOKS FINE FROM THE ENGINEERING CHECKS.
Questions and Concerns to Mission Support:
ATV#2 BATTERY IS DEAD. LOOKS LIKE IT WAS DEAD FOR A WHILE. HAVE TO CHECK HOW TO RECHARGE IT. ALL OTHER ATVS ARE GOOD.
Requests:
WATER FILTER FOR DRINKING WATER EXPIRING. WOULD BE NICE TO HAVE A REPLACEMENT.