1212-EngineeringReport
Engineering Report
Date: Dec 12th 2015
Crew Engineer Name: Ilaria
Diesel – 67%
Propane –50 %
Gasoline (5 Gallon containers for ATV) – 5
Water (trailer) measured in cm from the bottom– full
Water (static) measured in cm from the top – 24 cm
Trailer to Static Pump used – no
Water (loft) – 6
Static to Loft Pump used - yes
Water Meter:
Atv # Oil Checked: 0
Atv # Fuel Used Gals: 0
Atv # Tires Status: 0
Atv # Hours Used Day: 0
Atv # Notes And Comments: 0
Summary of Engineering activities:
Wifi problems again...seems to be an ongoing issue.
Questions and Concerns to Mission Support: