1206-EngineeringReport

-------------------------------------------------------------------------------

Engineering Report

Date: Dec 6th 2015

Crew Engineer Name: Ilaria

Diesel –70%

Propane –57 %

Gasoline (5 Gallon containers for ATV) – 5

Water (trailer) measured in cm from the bottom– 19 cm from the top

Water (static) measured in cm from the top – 29.5 cm

Trailer to Static Pump used – no

Water (loft) – 12

Static to Loft Pump used - yes

Water Meter:

Atv # Oil Checked: 0

Atv # Fuel Used Gals: 0

Atv # Tires Status: 0

Atv # Hours Used Day: 0

Atv # Notes And Comments: 0

Summary of Engineering activities:

We are running out kitchen paper and paper napkins. We can use toilet paper to replace the towels but it wont be enough until the end of the mission.

The garbage outside (3 bins) are full and we are going to leave the future garbage out of the bins ( I am a little bit worry for the animals around).

One of the member of the HBO used the toilet without following the instruction. Hence the toilet was blocked until this afternoon.The toilet was plounged but it is not flushing as it is supposed to do. I will keep you post on that.

Questions and Concerns to Mission Support: