Crew Engineer Name: Anderson Wilder
Diesel – 50% (It’s hard to keep an accurate number because I stand so
far below the needle)
Propane – 11%
Gasoline (5 Gallon containers for ATV) – 10 Gallons
Water (trailer) measured in inches from the top– 28 inches (EMPTY)
Water (static) measured in inches from the bottom – 30
Trailer to Static Pump used – NO
Water (loft) – 8
Static to Loft Pump used – YES, used the night before to level 12 before
sleep
Water Meter: 104,000.3
Atv # 1,3,5 Oil Checked: Good
Atv # 1,3,5 Fuel Used Gals: 0
Atv # 1,3,5 Tires Status: Good
Atv Hours Used Day: 0
Atv Notes And Comments: Same as Sol #1, ATV #2 does not work at all.
ATV #4 battery reported to be really low, so not operational. Will
attempt to charge battery this week
Summary of Engineering activities: Went through basic engineering report
procedures, everything is good
Notes: N/A
Questions and Concerns to Mission Support
N/A
REQUESTS
Need to get a refill on the trailer water tank
Trash needs to be taken out
Refill the propane tank