0302-EngineeringReport
Engineering Report 164.10
------------------------------
--------------------------------------------------
Engineering Report
--------------------------------------------------------------------------------
Date: 03/02/2016 at 6:30p.m.
Crew Engineer Name: Louis Maller
Diesel – 0%
Propane – 52%
Gasoline (5 Gallon containers for ATV) – one empty container, one
half full (2.5 gallons)
Water (trailer) measured in cm from the bottom– 19in / 42in i.e.
48cm/106.6cm from the bottom
Water (static) measured in cm from the top – 29in / 42in i.e.
73cm/106.6cm from the top
Trailer to Static Pump used – 0in i.e. 0cm
Water (loft) – 90.8 liters i.e. 24 gallons
Static to Loft Pump used – 78 gallons i.e. 295 liters
Water Meter: 105 316.4 gallons
Atv # Oil Checked: all ATVs full
Atv # Fuel Used Gals: Half a gallon due to today’s EVA (3 ATVs)
Atv # Tires Status: No tire problems
Atv # Hours Used Day: 1h00
Atv # Notes and Comments:
ATV#3 OK
ATV#2 OK
Red Honda OK
ATV#4 is reported to have some gearbox problems. It works but we’re
afraid of damaging the gearbox when using it, because it makes strange
noises when the gears change.
Summary of Engineering activities:
Engineering check during morning EVA
Questions and Concerns to Mission Support:
A leak was spotted a little left of the previous leak during the EVA.
There was a puddle which contained fairly a lot of water. Is it also a
known leak?
The diesel gauge issue is already taken care of.
Cheers,
Louis Maller
Crew Engineer for MDRS Supaero Crew 164