1118-EngineeringReport

Engineering Report

11/18/2014

Ian Siversides

Yesterday’s air vent clappet opening device for increased airflow in the crew quarters increased crew comfort in the morning. Metrics are reduced morning stuffiness and eye irritation. Requesting permission to place a fan in front of the air vent for further increased air circulation.

The toolbox drawers in the engineering room have been identified with their contents based on the previous crew engineer’s recommendation.

Yesterday’s water use: 33 L/person

Today’s water use: 36 L/person

Today’s water use will increase as the last reading will occur at 8 PM. Several crewmembers had a shower today, and measures for grey water collection have been put into place.