1208-EngineeringReport

-------------------------------------------------------------------------------

Engineering Report

Date: Dec 8th 2015

Crew Engineer Name: Ilaria

Diesel –69%

Propane –50 %

Gasoline (5 Gallon containers for ATV) – 5

Water (trailer) measured in cm from the bottom– full (42 cm from the bottom)

Water (static) measured in cm from the top – 35 cm

Trailer to Static Pump used – no

Water (loft) – 12

Static to Loft Pump used - yes

Water Meter:

Atv # Oil Checked: 0

Atv # Fuel Used Gals: 0

Atv # Tires Status: 0

Atv # Hours Used Day: 0

Atv # Notes And Comments: 0

Summary of Engineering activities:

Everything is ok.

The tank on the trailer was fliied of water, the bins are empty and there are two full gasoline container.

Questions and Concerns to Mission Support: