0318-EngineeringReport
Date: 03/18/2016 at 6:30p.m.
Crew Engineer Name: Eriko Moriyama & Masashi Hiraki
Diesel – 74%
Propane – 42%
Gasoline (5 Gallon containers for ATV) – 1 full container, 1 empty container
Water (trailer) measured in cm from the bottom– 17in / 42in i.e. 43.2cm/106.6cm
Water (static) measured in cm from the top – 1in / 42in i.e. 2.5cm/106.6cm
Trailer to Static Pump used – Yes
Water (loft) – 50gallons
Static to Loft Pump used – 28gallons
Water Meter: 106,225.7
Summary of Engineering activities: We used 2 EVA back packs and 2 ATVs, then we refilled gasoline to all ATVs. Thank you so much foryour support.
Questions and Concerns to Mission Support:
Nothing.