320-EngineeringReport

Hello Mission Support,

Engineering Report

Date: March 20, 2015

Crew Engineer Name: Mehdi Scoubeau

Diesel – 75%

Propane – 56%

Gasoline – 10 gallons in tank

Water (trailer) – distance from top: 25 cm

Water (static) – distance from top: 40 cm

Trailer to Static Pump used - no

Water (loft) – 40 gallons

Static to Loft Pump used – yes

Summary of Engineering activities:

- I prepared the EVA of tomorrow by cleaning the helmets and the headsets/micros.

- We fixed the handle of the pump used to transfer water from the trailer tank to the water tank.

- On main generator

- Internet connection via WiFi

- HALpr on

Questions and Concerns to Mission Support:

- Some pages (“record eva plan” and “explore possible eva routes”, for example) on HALpr do not seem to be available because of an “internal server error”.

- We checked again, there are only 3 working headsets/micros.

Thank you,

Mehdi Scoubeau