Diesel: 46%

Propane: 55%

Gasoline (5 Gallon containers for ATV): 5

Water (trailer) measured in cm from the bottom: 15.5 cm

Water (static) measured in cm from the top: 28 cm

Trailer to Static Pump used: no

Water (loft): 11

Static to Loft Pump used - yes

Water Meter:

Atv # Oil Checked: 0

Atv # Fuel Used Gals: 1/3

Atv # Tires Status: The ATV n.4 has the back left wheel that is wobbling a bit.

Atv # Hours Used Day: 1 hour

Atv # Notes And Comments: 0

Summary of Engineering activities:

Everything looks fine.

Questions and Concerns to Mission Support:

No particular questions or concerns. The only thing is that in the future maintenance of ATV, the back left wheel of ATV n.4 needs to be checked as it is wobbling a bit.

The numbering has been modified so now what is written in the ATV is consistent with the key numbers . To be precise now, ATV 1 and 3 are the ones working. Number 2 is the one without bettery, the 4 is the one with the other problems (air filter and brake).