Engineering Report

05/03/2016

Crew 169 Engineer

Elizabeth Centurion: Installed the electronic system for the Autonomus Drip System and installed the pips with tapes.

Orson Lazo: Prepared the components and the systems for the second EVA`s for tomorrow. Testing and repair the circuits for the correct charge of the oxygen tanks and check the radio system.

Marcos Bruno: Had some problems with rover’s battery. Installed the user interface for the camera and the remote control system.

Celeste Balladares: I’ve resolved the joints coordination movement, but not fineshed yet the two servomotor adaptation.

Nolverth Huaman: Acondition for green hab and the seats for then plants them.

Luis Ibañez: Obtained the principal measurements of the hub and now work in a computer design.