0514-EngineeringReport

Engineering Report

SOL: 13

Crew Engineer Name: Walter Orson Lazo Pazce

Diesel – Full, 100%

Propane – 20%

Gasoline (5 Gallon containers for ATV) – Actually we have 4 gallons

Water (trailer) measured in cm from the bottom– 0 centimeters

Water (static) measured in cm from the top – 8 centimeters

Trailer to Static Pump used – 1

Water (loft) – Static to Loft Pump used – 120

Water Meter: 0.15

Atv # Oil Checked: Ok

Atv # Fuel Used Gals: 0

Atv # Tires Status: That’s ok

Atv # Hours Used Day: 0

Atv #

Notes and Comments: Not yet

Summary of engineering activities:

Elizabeth Centurion: Disassembly of the structure for the grip system and elaborated the final conclusions of the germinated plants in the system mechatronic and the simple system and compared those. Obtained the propose objectives.

Orson Lazo: Elaborated the final report where explain the goals obtained in his project for the final of the simulation: Obtained the map of the body where indicate the muscles that will generate more electricity with the triboelectric generators in a new astronaut clothe. Obtained the propose objectives.

Marcos Bruno: Planning the new improvements for optimize the functions of the robot for future projects. Obtained the propose objectives.

Celeste Balladares: Performed the compilation of the results obtained in her three EVA`s and analyzed the results for the final report. Obtained the propose objectives.

Nolverth Huaman: Analyzed the final results that he can to see in his experimentation and elaborated the final report. Obtained the propose objectives.

Luis Ibañez: Validate the propose model for improve the HUB and the installations for the future crews. Explained the process and the steps for the design in his final report. Obtained the propose objectives.

Jeel Moya: Elaborated the final report, where explained the steps for obtained the correct samples for the study of the bacteria. Obtained the propose objectives.

Questions and Concerns to Mission Support: Not Yet.