Date: 03/10/2016 at 6:00p.m.
Crew Engineer Name: Eriko Moriyama & Masashi Hiraki
Diesel – 77%
Propane – 47%
Gasoline (5 Gallon containers for ATV) – 2 empty containers
Water (trailer) measured in cm from the bottom– 11in / 42in i.e. 27.9cm/106.6cm
Water (static) measured in cm from the top – 6in / 42in i.e. 15.2cm/106.6cm
Trailer to Static Pump used – 28.5in i.e. 72.4cm
Water (loft) – 48gallons
Static to Loft Pump used – 24gallons
Water Meter: 105,799.7
Summary of Engineering activities: We are so happy for refilled water!!
Questions and Concerns to Mission Support:
Toilet: Thank you for toilet manual, we will try to check flush valve tomorrow. Fuse: We searched for fuses inside toolbox, shelves and other places in Hab, but we could not find it. ATV: Ken repaired ATV#4’s parking brake when we were in EVA. I am attaching a photo. Water: Thank you for refilling the trailer tank. Everyone cannot wait to take a shower. Gasoline: we are still waiting.