0108-EngineeringReport

ENGINEERING REPORT SOL 13

Date: 08 January 2016

Crew Engineer Name: MARC CAROFANO III

Diesel – 98 %

Propane –31 psi

Gasoline (5 Gallon containers for ATV) – 1 FULL 5 GALLON JUG 1 HALF FULL 5 GALLON JUG = 7.5 GALLON

Water (trailer) measured in inches from the top–EMPTY EXCEPT FOR A SHEET OF ICE 36IN

Water (static) measured in inches from the bottom – 33.5 IN

Trailer to Static Pump used – NO

Water (loft) – 7

Static to Loft Pump used – YES

Water Meter: 0103156.0

Atv # Oil Checked: NO

Atv # Fuel Used Gals: 0

Atv # Tires Status: N/A

Atv # Hours Used Day: 0

Atv # Notes And Comments: N/A

Summary of Engineering activities:

-TIGHTENED THE STAIRS VIA SCREWS IN STRATEGIC PLACES

Notes:

Everything looks fine from the Engineering Checks

Questions and Concerns to Mission Support

REQUESTS

-REQUESTING TO HAVE THE WATER TRAILER FILLED FOR THE FOLLOWING ROTATION THE TANK IS CURRENTLY EMPTY.

-REQUEST TO HAVE THE GARBAGE REMOVED AS WELL.

-REQUEST TO HAVE THE PROPANE REFILLED THE TANK IS GETTING LOW.