0111-EngineeringReport
SOL 2
ENGINEERING REPORT
Crew Engineer Name: MIKHAIL KHMELIK
Date: 11 January 2016
Diesel – 80%
Propane –29 PSI
Gasoline (3 Gallon containers for ATV) – 1 FULL, 1 HALF FULL
Water (trailer) measured in inches from the top– 0 from top and 30in form bottom
Water (static) measured in inches from the bottom – 27.5 IN
Trailer to Static Pump used – NO
Water (loft) – 9
Static to Loft Pump used – YES
Water Meter: 0103261.7
Atv # Oil Checked: YES, GOOD
Atv # Fuel Used Gals: ABOUT 0.5
Atv # Tires Status: GOOD
Atv # Hours Used Day: 0.2 HOURS
Atv # Notes And Comments: ALL GOOD
Summary of Engineering activities:
EVA, ENGINEERING CHECKS
Notes:
Everything looks fine from the Engineering Checks
Questions and Concerns to Mission Support
NONE
REQUESTS
NONE
Wish you the very best