319-CommanderCheckInReport
CommanderCheckIn Report
03/19/2014
Jamie Guined
Crew Physical Health:
The Crew is doing great!
Eva Depart Time:
0830
Eva Return Time:
1130
Narrative Of Field Mission Results:
Greenhab Officer completed organization and cleaning of the Greenhab, and also planted the flowers as per Greenhab Director Orenstein's direction.
Eva Depart Time:
Eva Return Time:
Narrative Of Field Mission Results:
Waste management system (septic tank) was pumped today; was full. Crew Engineer identified what appears to be cracked pipes coming from a couple of different locations within the Hab.
Eva Depart Time:
Eva Return Time:
Narrative Of Field Mission Results:
EVA #2 of the mission was a success.
Eva Depart Time:
Eva Return Time:
Narrative Of Field Mission Results:
Crew Journalist re-established contact with the satellite that was damaged by Monday's windstorm.
Eva Depart Time:
Eva Return Time:
Narrative Of Field Mission Results:
Hab Maint:
Septic system was pumped
Greenhab was cleaned and organized
Rep Sched:
Commander's Check-In Report
Commander's Report
Engineering Report
EVA Report
EVA Plan
Greenhab Report
Journalist Report
Photos of the day
Supplemental Potable Water Report
Tomorrow Plan:
EVA #3, food organization and inventory, continue working on the handbooks and checklists pertaining to MDRS operations.
Inventory:
Running very low on dishwashing liquid.
Support Req:
Water on trailer needs a refill (it is now empty), and we request a trash pick up.
Miscelleneous: