0327-EngineeringReport
Hello Mission Support,
Here is the engineering report:
Date: 03/27/2016 at 6:40p.m.
Crew Engineer Name: Gregory Edison
Diesel – 57%
Propane – 39%
Gasoline (5 Gallon containers for ATV) – 1 full container, 1/5 of a container
Water (trailer) measured in cm from the bottom– 28in / 42in
Water (static) measured in cm from the bottom – 34in / 42in
Trailer to Static Pump used – No
Water (loft) – 49 gallons
Static to Loft Pump used – 52 gallons
Water Meter: 106635,1 gallons
Summary of Engineering activities: Routine check.
Questions and Concerns to Mission Support
Power: Still on Cat, down 5 min at 5 pm. Added one quart of oil.