0106-EngineeringReport
ENGINEERING REPORT SOL 11
Date: 06 January 2016
Crew Engineer Name: MARC CAROFANO III
Diesel – 100 %
Propane –35 psi
Gasoline (5 Gallon containers for ATV) – 1 FULL 5 GALLON JUG 1 HALF FULL 5 GALLON JUG = 7.5 GALLON
Water (trailer) measured in inches from the top– 30 IN
Water (static) measured in inches from the bottom – 29 IN
Trailer to Static Pump used – NO
Water (loft) – 8
Static to Loft Pump used – YES
Water Meter: 0103046.3
Atv # Oil Checked: NO
Atv # Fuel Used Gals: 0
Atv # Tires Status: N/A
Atv # Hours Used Day: 0
Atv # Notes And Comments: N/A
Summary of Engineering activities:
N/A LAZY DAY
Notes:
Everything looks fine from the Engineering Checks
Questions and Concerns to Mission Support
REQUESTS
-TO HAVE THE LOGIN AND PASSWORD SPECIFICALLY FOR THE ROVERS COMPUTER TO BE ABLE TO ACCESS THE ROVER VIA A MONITIOR AND KEYBORD HOOKED TO THE ROVER TO ATTEMPT TO GET THE ADDITIONAL TWO CCD’S BACK ONLINE.