0304-EngineeringReport

Engineering Report 164.12

------------------------------

--------------------------------------------------

Engineering Report

--------------------------------------------------------------------------------

Date: 03/04/2016 at 6:00p.m.

Crew Engineer Name: Louis Maller

Diesel – 100%

Propane – 50%

Gasoline (5 Gallon containers for ATV) – two empty containers

Water (trailer) measured in cm from the bottom– 19in / 42in i.e.

48cm/106.6cm from the bottom

Water (static) measured in cm from the top – 27in / 42in i.e.

68.6cm/106.6cm from the top

Trailer to Static Pump used – 0in i.e. 0cm

Water (loft) – 30 gallons i.e. 113.56 liters

Static to Loft Pump used – 50 gallons i.e. 189.3 liters

Water Meter: 105 459.1 gallons

Atv # Oil Checked: all ATVs full

Atv # Fuel Used Gals: None, all ATVs refueled

Atv # Tires Status: No tire problems

Atv # Hours Used Day: Not used

Atv # Notes and Comments: None

Summary of Engineering activities:

Engineering check during morning EVA.

Questions and Concerns to Mission Support:

None, the Hab and all material are in working order, apart from the

backpack battery shortage Camille already sent a mail about, and which

is being taken care of.

Cheers,

Louis Maller