202-EVAReport

Eva Report

02/02/2015

Lucie Poulet

Eva Number:

7bis

Eva Date:

2015-02-02

Time Slot:

laterPM

Purpose:

Engineering EVA.

Filling the static pump when plugged to a different electrical outlet.

Narrative:

The crew was composed of our crew engineer Duarte and our crew scientist Nuno. They existed the airlock at 18:10 and proceeded with static tank refilled. The EVA lasted a total of 28 min from start of depressurization to end of repressurization. Filling the tank was successful, the pump worked.

Eva Depart Time:

18:10

Check In Time One:

18:14

Check In One E:

518230

Check In One N:

4250725

Check In Note One:

Start refilling of the static tank

Check In Time Two:

18:25

Check In East Two:

518230

Check In Note Two:

Tank full

Check In Time Three:

Check In East Three:

Check In North Three:

Check In Note Three:

Check In Time Four:

Check In East Four:

Check In North Four:

Check In Note Four:

Eva Return Time:

18:27

Wp1 E:

Wp1 N:

Waypoint1arrive Time:

Eva W P1depart Time:

Wp1 Find:

Wp2 E:

Wp2 N:

Eva W P2arrive Time:

Eva W P2depart Time:

Wp2 Find:

Wp3 E:

Wp3 N:

Eva W P3arrive Time:

Eva W P3depart Time:

Wp3 Find:

Wp4 E:

Wp4 N:

Eva W P4arrive Time:

Eva W P4depart Time:

Waypoint Four Finding:

Waypoint Five Easting:

Waypoint Five Northing:

Waypoint Five Arrive Time:

Waypoint Five Depart Time:

Waypoint Five Findings: