0329-EngineeringReport

Hello Mission Support,

Here's the engineer's report, have a good evening:

Date: 03/29/2016 at 6:30p.m.

Crew Engineer Name: Gregory Edison

Diesel – 52%

Propane – 37%

Gasoline (5 Gallon containers for ATV) – 2 full containers

Water (trailer) measured in cm from the bottom– 28in / 42in

Water (static) measured in cm from the bottom – 30in / 42in

Trailer to Static Pump used – No

Water (loft) – 45 gallons

Static to Loft Pump used – 31 gallons

Water Meter: 106705,1 gallons

Summary of Engineering activities: Routine check. Used the electric

tape to fix power on rover. Works fine now, no short-circuit.

Questions and Concerns to Mission Support:

Power: Still on the Cat. The sensor arrived, DG installed it, still something

wrong. Down for 5 minutes at 5 pm. Added three quarts of oil.