SOL 4

ENGINEERING REPORT

Crew Engineer Name: MIKHAIL KHMELIK

Date: 13 January 2016

Diesel – 70%

Propane – 25%

Gasoline (3 Gallon containers for ATV) – 1 FULL, 1 HALF FULL

Water (trailer) measured in inches from the top – 0Water (trailer) measured in inches from the bottom – 42 IN

Water (static) measured in inches from the bottom – 24 IN

Trailer to Static Pump used – NO

Water (loft) – 9

Static to Loft Pump used – YES

Water Meter: 0103343.7

Atv # Oil Checked: NO

Atv # Fuel Used Gals: 2 TOTAL

Atv # Tires Status: YES

Atv # Hours Used Day: 1 HOUR

Atv # Notes And Comments: ALL GOOD

Summary of Engineering activities:

ENGINEERING CHECKS

Notes:

EVERYTHING LOOKS FINE FROM THE ENGINEERING CHECKS

Questions and Concerns to Mission Support:

1. PLEASE CLARIFY WHEN TO REFILL THE STATIC TANK.

2. A LOT OF WATER WAS USED DURING THE NIGHT FROM THE LOFT TANK. WILL CHECK TOMORROW AGAIN.

Requests:

GASOLINE FOR ATVS NEEDED. MULTIPLE EVAS SCHEDULED.