0128-EngineeringReport
ENGINEERING REPORT SOL #5
Date: 28 Jan 2016
Crew Engineer Name: Anderson Wilder
Diesel – 50% (It’s hard to keep an accurate number because I stand so
far below the needle)
Propane – 87%
Gasoline (5 Gallon containers for ATV) – 10 Gallons
Water (trailer) measured in inches from the top– was taken away and
brought back today
Water (static) measured in inches from the bottom – 30
Trailer to Static Pump used – No, trailer brought back after dark, will
check it in the morning
Water (loft) – 4
Static to Loft Pump used – NO, will use before going to bed tonight.
Water Meter: 104,018.7
Atv # 1,3,5 Oil Checked: Good
Atv # 1,3,5 Fuel Used Gals: Unknown
Atv # 1,3,5 Tires Status: Good
Atv Hours Used Day: ¾ hr
Atv Notes And Comments: ATV #1 was discovered to have a shimmy in the
back driver wheel that was noticed during the outgoing trip of the EVA,
so I rode it back on the return trip of the EVA to check and verify the
issue. Due to that I will be taking ATV #1 down and diagnosing the
problem tomorrow.
Summary of Engineering activities: Went through basic engineering report
procedures, everything is good
Notes: Propane and water was refilled, thanks
Questions and Concerns to Mission Support
N/A
REQUESTS
N/A