0201-EngineeringReport

ENGINEERING REPORT SOL #9

Date: 01 Feb 2016

Crew Engineer Name: Anderson Wilder

Diesel – 50% (It’s hard to keep an accurate number because I stand so far

below the needle)

Propane – 81%

Gasoline (5 Gallon containers for ATV) – 10 Gallons

Water (trailer) measured in inches from the top– topped off

Water (static) measured in inches from the bottom – 25.5

Trailer to Static Pump used – No

Water (loft) – 12

Static to Loft Pump used – Yes, topped it off

Water Meter: 104,099.0

Atv # 1,3,5 Oil Checked: Good

Atv # 1,3,5 Fuel Used Gals: Unknown

Atv # 1,3,5 Tires Status: Good

Atv Hours Used Day: 20-30 mins on 1 and 3

Atv Notes And Comments: ATV #1 is out of commission as of right now, so

all that we have operational is ATV #3 and 5 at this moment. Battery to

ATV #4 is very likely dead, charging it did not make a noticeable

difference. Ran #1 and #3 for about 10-15 mins a piece and then rode

around for a few mins. #5 did not make it through the night so I brought in

its battery to charge it, it’ll probably be touch and go though

Summary of Engineering activities: Went through basic engineering report

procedures, everything is good

Notes:

N/A

Questions and Concerns to Mission Support:

N/A

REQUESTS:

N/A