0505-EngineeringReport

Engineering Report

SOL: 04

Crew Engineer: Walter Orson Lazo Pazce

Diesel – n/a

Propane – n/a

Gasoline (5 Gallon containers for ATV) – 9 gallons

Water (trailer) measured in cm from the bottom– n/a

Water (static) measured in cm from the top – 51 centimeters

Trailer to Static Pump used – 0

Water (loft) – Static to Loft Pump used – 46 liters

Water Meter: 20L

Atv # Oil Checked: OK

Atv # Fuel Used Gals: 0

Atv # Tires Status: OK

Atv # Hours Used Day: 0 hours

Atv # 0

EngSupPower Report - Temporary Outage

05/05/2016

Power Outage Type: unexpected

Power Fail Date: May 5th, 2016

Power Fail Time: 10:00 hours aprox.

Power Back Date: May 5th, 2016

Power Back Time:15:00 hours aprox.

Standby Gen Used: Yes

Standby On Time: 15:00 hours aprox.

Standby Off Time: Not yet, it is the only one we have

Hal Server Restarted: Yes

Water Heater Restarted: Yes

Smoke Alarms Tested: No

Notes and Comments: Not yet

Summary of Team Engineering activities:

Elizabeth Centurion: Completed electronic and mechanic components of project.

Orson Lazo: Validating the choice muscles of the legs and the arms that he obtained; how conclusions trough of two EVA`s elaborated.

Marcos Bruno: In his first EVA, he tested the connectivity, movement and the function of the step motors installed in the tool. Needs some optimization.

Celeste Balladares: Support Marcos' EVA. Check robot programming.

Nolverth Huaman: Sample seed germination dates observed and recorded.

Luis Ibañez: Enhance virtual model trough software of CFD (Computer Fluid Dynamics) for the simulation of air around theHab.

Jeel Moya: Test the samples of two subjects of study for his project. Create a list with the things of the pharmacy box.

Questions and Concerns to Mission Support: Temporary generator outage resolved by Crew Engineer.