0131-EngineeringReport
ENGINEERING REPORT SOL #8
Date: 31 Jan 2016
Crew Engineer Name: Anderson Wilder
Diesel – 50% (It’s hard to keep an accurate number because I stand so far
below the needle)
Propane – 82%
Gasoline (5 Gallon containers for ATV) – 10 Gallons
Water (trailer) measured in inches from the top– topped off
Water (static) measured in inches from the bottom – 28
Trailer to Static Pump used – Yes
Water (loft) – 12, topped off
Static to Loft Pump used – No
Water Meter: 104,078.5
Atv # 3,5 Oil Checked: Good
Atv # 3,5 Fuel Used Gals: Unknown
Atv # 3,5 Tires Status: Good
Atv Hours Used Day: 0
Atv Notes And Comments: ATV #1 is out of commission as of right now, so
all that we have operational is ATV #3 and 5 at this moment. Battery to
ATV #4 is very likely dead, charging it did not make a noticeable difference
Summary of Engineering activities: Went through basic engineering report
procedures, everything is good
Notes:
N/A
Questions and Concerns to Mission Support
N/A
REQUESTS
N/A