1102-EngineeringReport
--------------------------------------------------------------------------------
Engineering Report
--------------------------------------------------------------------------------
Date: 02 November 2015
Crew Engineer Name: Stergios Palpanis
Diesel – 30%
Propane – 40% (gauge at the top of the tank)
Gasoline (5 Gal for ATV) – 60%
Water (trailer) – 65cm from the bottom
Water (static) – 17cm from the top
Trailer to Static Pump used - Yes
Water (loft) – 45 gallons
Static to Loft Pump used - Yes
Water Meter 100.300,70 Gallons on arrival (28/10/2015)
Atv # Oil Checked: Will be checked tomorrow
Atv # Fuel Used Gals: 2 gallons
Atv # Tires Status: Good condition (arrival)
Atv # Hours Used Day: 2 Atv for 1.5 hours
Atv # Notes And Comments: No Comments
Summary of Engineering activities: A lot of maintenance work has been taking place since our arrival to the Habitat. Today we spent most of our time replacing the deck outside the engineering airlock. Because of the nature of today’s activities we are not in simulation and we do not use the AVA suits. We used 2 ATVs to record GPS coordinates of the main road to the Habitat and some other secondary roads.
Questions and Concerns to Mission Support: Some of the parts of the Green Hab aquaponic equipment is still missing. The Embry-Riddle professor, who installed the equipment, said that he will send the missing parts. Until we receive them we cannot run a final check of the aquaponic equipment. In addition, there is limited water so we cannot run a leak test.