219-EngineeringReport
Engineering Report
02/19/2014
Gatien de Callataÿ
Was Power Interrupted:
no
Time Of Power Outage:
Length Of Power Outage:
Diesel Fuel Level:
0.56
Propane Fuel Level:
0.7
Gasoline Fuel Level:
0.75
Fuel Notes And Comments:
Atv Oil Quarts:
N.A.
Car Oil Quarts:
N.A.
Oil Notes And Comments:
Trailer Potable Water Level:
76
Trailer Potable Water Refilled:
no
Outside Potable Water Level:
16
Outside Potable Water Refilled:
no
Loft Potable Water Gallons:
55
Loft Potable Water Refilled:
yes
Potable Water Meter Reading:
00000.00
Greenhouse Notes And Comments:
The pipe issue is solved.
Telescope Used:
no
Observatory Notes And Comments:
Network Failed:
no
Network Throttled:
no
Network Signal Strength:
190
Network Download Allowane:
100
Network Notes And Comments:
Hvac Air Conditioner Used:
no
Hvac Furnace Used:
no
Hvac Lab Wall Heater Used:
yes
Hvac Upper Deck Thermostat Setting:
64
Hvac Upper Deck Temperature Reading:
64
Hvac Lower Deck Thermostat Setting:
64
Hvac Lower Deck Temperature Reading:
62
Hvac Notes And Comments:
Hab Car Used:
no
Hab Car Oil Checked:
no
Hab Car Tire Status:
Hab Car Odometer:
Hab Car Notes And Comments:
Atv One Used:
no
Atv One Oil Checked:
no
Atv One Fuel Used Gals:
Atv One Tires Status:
Atv One Hours Used Day:
Atv One Hours Used Year:
Atv One Notes And Comments:
Atv Two Used:
no
Atv Two Oil Checked:
no
Atv Two Fuel Used Gals:
Atv Two Tires Status:
Atv Two Hours Used Day:
Atv Two Hours Used Year:
Atv Two Notes And Comments:
Atv Three Used:
no
Atv Three Oil Checked:
no
Atv Three Fuel Used Gals:
Atv Three Tires Status:
Atv Three Hours Used Day:
Atv Three Hours Used Year:
Atv Three Notes And Comments:
Atv Four Used:
no
Atv Four Oil Checked:
no
Atv Four Fuel Used Gals:
Atv Four Tires Status:
Atv Four Hours Used Day:
Atv Four Hours Used Year:
Atv Four Notes And Comments:
Atv Five Used:
no
Atv Five Oil Checked:
no
Atv Five Fuel Used Gals:
Atv Five Tires Status:
Atv Five Hours Used Day:
Atv Five Hours Used Year:
Atv Five Notes And Comments:
Comments:
All is OK. We just repaired the light of the ASTROLAB tunnel. We will replace it after a night test to check the autonomy. Approved?
Notice about the repair: We dont have any rechargeable AA battery, we decide to put non-rechargeable battery, it works but the autonomy will be affected. We have to advise the next crew to bring the appropriate battery (AA, 1.2V, rechargeable).