0506-EngineeringReport
Engineering Report
SOL: 05
Crew Engineer Name: Walter Orson Lazo Pazce
Diesel – n/a
Propane – n/a
Gasoline (5 Gallon containers for ATV) – 9 gallons
Water (trailer) measured in cm from the bottom– n/a
Water (static) measured in cm from the top – 40 centimeters
Trailer to Static Pump used – 0
Water (loft) – Static to Loft Pump used – 35 liters
Water Meter: 20 centimeters
Atv # Oil Checked: OK
Atv # Fuel Used Gals: 0
Atv # Tires Status: OK
Atv # Hours Used Day: 0 hours
Atv # 0
Summary of Engineering activities: The work of the team today was:
Elizabeth Centurion: Check the configuration of the drip system, verification: the bottle for the river system didn`t use because it`s not necessary yet.
Orson Lazo: EVA`s requirement was not approved, and his project will be delay. He need two more EVA`s for finish his project.
Marcos Bruno: Check the results obtained in his first EVA`s.
Celeste Balladares: A motor shield controller for sixteen motors function only, and her robot have eighteen servo-motors. For this reason she will work only with sixteen freedom degrees for the mobility and then she does the testing step.
Nolverth Huaman: Dates observed of the different samples of seats in germination. Do a checklist of the things of the laboratory at the first floor.
Luis Ibañez: Design the virtual model trough software of CFD (Computer Fluid Dynamics) for the simulation of air around the Hab.
Jeel Moya: Observation and analysis of two samples obtained trough of the clothes of two crew members.