1204-EngineeringReport

--------------------------------------------------------------------------------

Engineering Report

Date: Dec 4th 2015

Crew Engineer Name: Ilaria

Diesel –70%

Propane –65 %

Gasoline (5 Gallon containers for ATV) –

Water (trailer) measured in cm from the bottom– 19 cm from the top

Water (static) measured in cm from the top – 39 cm

Trailer to Static Pump used – no

Water (loft) – 7

Static to Loft Pump used - yes

Water Meter:

Atv # Oil Checked: 0

Atv # Fuel Used Gals: 0

Atv # Tires Status: 0

Atv # Hours Used Day: 0

Atv # Notes And Comments: 0

Summary of Engineering activities:

· The walkie-talkie number 4 is working. It has a lot of interference in sending when is using with GPS.